4/10/21- Well it has been ages since I posted on the blog. This year I will make a better attempt at talking about my trips. Given that I have put in descriptions of all of the local rivers into this blog, I will now be cutting out the majority of the text for the rivers I paddle regularly. I will post mostly pictures, video, and a general description of the trip itself (ie: length, time, water levels, etc)

Put-in at the Summer St Bridge site (1900 Summer St, Bridgewater, MA 02324). Total Trip was 5.9 Miles up stream on the Nemasket to the bridge at 50 Murdock St, Middleborough, MA 02346. Water levels were quite high as they usually are this early in the season. Current was strong by the Murdock St bridge.